Leavening agent production

RB Group’s client, a global manufacturer and supplier of technical leavening agents, were experiencing increased demands in export markets. This identified a requirement for increased production and up sizing of the current facility. RB Plant were engaged to provide design for both relocation of existing equipment and expansion into existing buildings.

The challenge

RB Group have to date designed schemes based on this original scope and more recently new schemes as our client have subsequently committed to an additional building and a new build on the same site. We have had to be creative in our design to accommodate improved layouts of existing equipment as well as new installations over three identified phases of work.

The outcome

RB Group have also supplied construction phase cost estimates to provide civil / structural, electrical, mechanical and HVAC engineering disciplines, detail design and project management, construction management, CDM and procurement services. Our client is proceeding on this basis

The benefit

RB Group have satisfied all deliverables to date whilst processing changing scope demands and scheme options. RB Plant have provided consultancy services in excess of 650-man hours and are looking forward to moving on to the next phase of work. We have satisfied our client’s expectations and look forward to a continuing and mutually beneficial relationship

downloads

You may download a pdf of this case study via the link below.

find out more

Our experienced engineering team could support you on your next project. Why not contact Genghis Perriman our Business Development Manager to discuss further for a no-obligation discussion?

01622 858387